GreenRTech offers two technologies for waste recycling and disposal:

The system compiles with the highest eco-friendliness standards and is build based on cyclic water utilization.
It separates solid municipal waste of mixed collection type and divides them into individual flows: small raw material is delivered to other companies for sale in the form of fertilizers or road filling materials, intermediate and heavy raw materials are delivered for additional recycling
with the use of NCPC.
Light polymer fraction PET, plastic, elastic and rubber products
Solid mineral fraction: glass, coarse sand, stones, domestic batteries
Organic and cellulose fraction: food waste, soaked cardboard, paper
01
02
03
Технология ГСП
It allows for reducing the volume of waste disposal by more than 84%. The specific feature of this technology is that the pyrolysis process is carried out at the temperature of 250-500 degrees, which allows for reducing the hazard class of intermediate and solid waste to the minimum: from I to IV and V class.
In-house technology for deactivation of polymer and other organic waste is based on the process of non-contact cleavage of organic compounds and raw polymer materials.
NCPC technology is implemented on the mobile equipment that is set up individually. It allows for adjusting the ratio of synthesis gas and pyrolysis liquid and rapid installation.
Технология БРП
We thoroughly choose individual technologies during production and delivery of the equipment operated in aggressive environments. It allows for ensuring the maximum operational life of all complex elements.
1-1,5 hours
Waste loading from the metering hopper to the plant reactor
01
02
03
Completion of pyrolysis process, reactor cooling
04
Unloading of ash carbon residue, heavy, light and
intermediate fraction

General recycling process

Pyrolysis, generation of pyrolysis fuel, gas and ash carbon residue
5-8 hours
4-5 hours
1,5-2 hours
1-1,5 часа
Waste loading from the metering hopper to the plant reactor
01
5-8 часов
4-5 часов
Pyrolysis, generation of pyrolysis fuel, gas and ash carbon residue
02
Completion of pyrolysis process, reactor cooling
03
1,5-2 часа
Unloading of ash carbon residue, heavy, light and
intermediate fraction
04
1-1,5 hours
Waste loading from
the metering hopper
to the plant reactor
01
02
03
Completion of pyrolysis process, reactor cooling
04
Unloading of ash carbon residue, heavy, light and
intermediate fraction
Pyrolysis, generation of pyrolysis fuel, gas and ash carbon residue
5-8 hours
4-5 hours
1,5-2 hours
Contacts
Write to us
Address
Phone
+7 (495) 822-17-57
Ⓒ GreenRTech, 2021-2022
Design and development